Search for more Public Notices in your area
Highways England
Traffic

ROAD TRAFFIC REGULATION ACT 1984 -SECTION 14 THE A1(M) MOTORWAY (JUNCTION 49 TO JUNCTION 51) (TEMPORARY RESTRICTION AND PROHIBITION OF TRAFFIC) 2019

Notice ID: MF0430850

Notice effective from
6th June 2019 to 6th July 2019

highways england
ROAD TRAFFIC REGULATION ACT 1984 -SECTION 14 THE A1(M) MOTORWAY (JUNCTION 49 TO JUNCTION 51) (TEMPORARY RESTRICTION AND PROHIBITION OF TRAFFIC) 2019 NOTICE IS HEREBY GIVEN that Highways England Company Limited has made an Order on the A1(M) Motorway, in the Districts of Harrogate and Hambleton, to enable carriageway resurfacing and associated works, and traffic loop reinstallation works to be carried out in safety. The works are expected to start at 8pm on Saturday 10 June 2019 for 5 months, or until completed.
The effect of the Order will be to impose, at times during the works, a temporary 60mph and 50 mph speed restriction on the A1(M):
(i) northbound and southbound carriageways from the A168 Dishforth Road overbridge at Junction 49 (Dishforth) to 2000 metres north of the A684 underbridge at Junction 51 (Leeming Bar), a distance of 22350 metres;

(ii) northbound entry and southbound exit slip roads at Junction 49;

(iii) northbound and southbound entry and exit slip roads at Junction 50; and

(iv) northbound and southbound entry and exit slip roads at Junction 51.

It will be necessary to close, at times during the works the A1(M):
(i) southbound carriageway from the exit slip road at Junction 51 to the entry slip road at Junction 50 (Baldersby), a distance of 17500 metres. At times during the closure, traffic will be diverted onto the opposite carriageway using a contraflow system;

(ii) northbound carriageway from the exit slip road at Junction 50 to the entry slip road at Junction 51, a distance of 17500 metres;

(iii) southbound carriageway from the exit slip road at Junction 51 to the entry slip road at Junction 49, a distance of 21500 metres;

(iv) northbound carriageway from the exit slip road at Junction 49 to the entry slip road at Junction 51, a distance of 21500 metres;

(v) northbound entry and southbound exit slip roads at Junction 49;

(vi) northbound and southbound entry and exit slip roads at Junction 50;

(vii) southbound exit and entry slip roads at Junction 51; and

(viii) northbound exit slip road at Junction 51. During the closures, suitably signed alternative routes will be available at all times.

The works will require lane closures, during which times the hardshoulder will be used for traffic, on the A1(M):
(i) northbound carriageway from the A61 overbridge at Junction 50 to the A684 underbridge at Junction 51, a distance of 15300 metres; and

(ii) southbound carriageway from the A684 underbridge at Junction 51 to the A61 overbridge at Junction 50, a distance of

15300 metres.
It will also be necessary, at times during the works to ban vehicles with an overall width exceeding 6'6" in specified lanes of the A1(M) northbound and southbound carriageways from the A168 Dishforth Road overbridge at
Junction 49 to 2000 metres north of the A684
underbridge at Junction 51, a distance of
22350 metres.
Traffic management will be in force 24 hours a day and traffic signs will indicate the extent of the restrictions (which will not apply to emergency service vehicles or special forces vehicles) and prohibitions (which will not apply to emergency service vehicles or vehicles being used in connection with the said works or for winter maintenance or traffic officer purposes). The Order comes into force on 9 June 2019 and has a maximum duration of eighteen months. The contact for any further information about this notice is Clair Galloway, Tel: 0300 470 2593, e-mail:

clair.galloway@highwaysengland.co.uk


RICHARD FOXTON, Highways England,
3 South, Lateral, 8 City Walk, LEEDS LS11 9AT.

Attachments

MF0430850.pdf Download

Comments

or Register to leave a comment and/or receive comment alerts.

Related notices